Importing Food Machinery from China — the Costs Nobody Quotes

The machine price is the part everyone compares. The landed, installed, running cost is the part that decides whether the project works. This is a checklist we would want if we were buying — written by the supplier, which is unusual, but you will find it out anyway.

Importing Food Machinery from China — the Costs Nobody Quotes — Ultipower Tech nut processing equipment

Between our factory and your floor

ItemWho normally paysNote
Export packingIncluded in our scopeConfirm it is in the quotation, not an extra
Inland freight to portDepends on IncotermEXW vs FOB changes who arranges this
Sea freight and insuranceBuyer under FOBRates move a lot — get a fresh quote, not last year's
Import duty and VATBuyerDepends on HS code and destination — check before you order
Customs clearance and port chargesBuyerOften underestimated
Unloading and rigging into the buildingBuyerCrane or forklift capacity must match machine weight

Costs inside your own building

Multi-function continuous roasting oven DGKX-C
Multi-function continuous roasting oven DGKX-C
  • Foundations — we provide a layout drawing with foundation and utility points so your contractor can price it properly
  • Gas connection sized for the burner, and the permit that goes with it
  • Electrical connection at the correct voltage and frequency, plus the cabling run
  • Fume extraction routed to outside air, especially for frying
  • Compressed air, if your configuration uses pneumatic valves

The two that hurt most when forgotten

Spare parts. Order the wear items with the machine. A low-value wear part with a six-week lead time stops a production line, and the cost of that downtime dwarfs the part. We supply a spare-parts list with part numbers precisely so you can decide what to stock.

Voltage. Retro-fitting motors, gearboxes and a control cabinet after delivery is far more expensive than specifying them correctly before manufacture. This is why destination grid gets confirmed in the contract drawing, not assumed.

Automatic nut coating group
Automatic nut coating group

Compliance documents — how to handle it properly

Different destination markets require different documentation, and the honest answer is that it depends on your market, your product and how the machine is being placed on that market. Tell us the destination market at enquiry stage and we will confirm in writing which compliance documents can be supplied for your specific order — before you place it, not after.

Be wary of any supplier who promises a specific certification in a first email without asking a single question about your market.

Questions we get asked about this

Do you handle shipping, or do I?
Either, depending on the Incoterm we agree. What matters is that it is explicit in the contract so nobody assumes the other side booked the vessel. Tell us your preference and your port.
Do you send engineers to install?
Video commissioning and remote guidance are included as standard — we walk your technician through mechanical setup, burner tuning, first roast curve and cleaning routine. On-site installation by our engineers can be arranged separately, with travel, visa and accommodation quoted for your location.
What documents come with the machine?
English operating manual, electrical wiring diagrams, layout drawing with foundation and utility points, spare-parts list with part numbers, and packing list.

Want this costed for your factory?

Send your finished product, target kg/h and grid voltage. You get a machine list, layout and budget price within one working day.

Send Enquiry

Tell us the product. We'll quote the line.

Send a product photo or sample and your target output per hour. You get a machine list, layout sketch and budget price.

Start an Enquiry